Monday, June 17, 2019
Cymap Coursework Example | Topics and Well Written Essays - 2750 words
Cymap - Coursework ExampleIt measures 8.5 metres going crosswise (east-west) and is 2.5 metres going up and down (north-s come forwardh). Room B60 is a rectangle, bit Room B62 is a bit oddly-shaped. There is a space between the office and the wall of the S/W room of about 6 metres across and 3.5 metres up and down. There are (what can only be assumed to be) marks meaning doorways, in 4 areas of the building. The S/W room has no doorway out except through the backway. Similarly, Rooms B60, B62, and the Office only have wizard doorway out apiece. Both B60 and B62 have doorways at the back, duration the Office doorway is on the side and leads to Room B62 where the fourth doorway is at the back of the building. This could prove to be logistically difficult if one needed to grasp into or out of any of the retinue but the one doorway in each room were blocked. This would most definitely be a brush off hazard. III. Project Wizard Since the building floor plan has been designed, now th e process of services design can begin. The Cymap project is going to be defined. Next, the different aspects (stages IV through VI) can be designed in their proper sequence. For our purposes, we are going to develop these stages independently, one after another. However, the same sequence will be followed. On small tasks, only one service might be needed. It is assumed that this project will use the floor plan as given, and one or more types of services. This is contained within the entirety of this single projectwhich can then be linked to the floor plan in Cymap. In auberge to start a new project, I went to File, and then clicked on New to open the New Project Wizard. This helped set up my floor plan, and helped define the geometry and profiles of the rooms in the project and provided me... This lab report shows what was designed in Cymap with a hand-drawn drawing what the author actually did when the author was going step-by-step through the automated computer program, which generated several of the necessary defaults. For most places where the author was asked to enter figures, the author usually went with what was the minimum limit because the author didnt want to stress out the system or use all of my maximum limits with various figuressuch as the personal line of credit lengths. Many of the figures were variable, but Cymap definitely made the process easier. The outfit program was used to define the inter-connectability of all the rooms, allowing the generation of a list of components required to complete the necessary installations. From the menu, the author selected Electrical, then selected Wiring 17th Edition, then opening the new Wiring file which the author used to incorporate the main incomer and the switchboard. The author selected the IEE BS7671 Standard, because obviously the Wiring 16th Edition was old (the showtime used for this paper was actually too old, so the author made sure to choose the 17th Edition as demanded by the UK Wiring Regulations from 2008). When the planetary Information dialogue box appeared, in the General tab, the author added my own name, Abdullah, as a reference name for the file and selected BS7671_17th + ERA 2008.DBY as the cable database. The author also selected the CPD database. The author included a supply transformer. The author used a 5% impedance and selected an earth type the author sight was appropriate.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.